The project consists of the demolition and removal of play equipment at Lewisville Regional Park.
SMALL WORKS PROJECTS
As of 2013, Clark County is using the Municipal Research and Services Center of Washington (MRSC) Rosters to maintain its small works roster for non-federally funded public work projects under $350,000. To meet the eligibility requirements for Clark County small work projects contractors must submit their application (at no cost) to www.mrscrosters.org and select Clark County in your application.
You must be registered on the MRSC Roster to receive the Small Works Quote documents.
Once registered on the MRSC Roster to request a Bid Packet, E-mail: Purchasing@clark.wa.gov or call 564-397-2323
Closing Date: Wednesday, April 23, 2025
A site visit has been scheduled.
The work includes, but is not limited to sawcut, remove, prep, and replace approximately 15,000SF asphalt inside the fenced area of the Clark County Fairgrounds. Items to repair/replace asphalt include but are not limited to potholes, loose or missing asphalt, truck ruts, cracking, uneven surfaces, etc.
Closing Date: Wednesday, April 9, 2025
A site meeting has been scheduled.
The project consists of the demolition of an 800 square foot loafing shed built in 1948 and a 5,000 square foot steel pole barn built in 1950 and is referred to as the Schriber property.
Addendum 1 - Issued Friday, March 21, 2025
Closing Date: Wednesday, April 2, 2025
A meeting has been scheduled.
The project consists of the demolition of a 1955 stick built dwelling with detached garage, a barn and two (2) outbuildings.
Addendum 1 - Issued Friday, February 28, 2025
Closing Date: Wednesday, March 5, 2025
A site visit has been scheduled.
The project consists of hazard tree mitigation services by removal at Cougar Creek Woods Community Park.
Closing Date: Wednesday, February 12, 2025
A site meeting has been scheduled.
The Franklin Center has deteriorating stairs and is a five (5) story building, semi-enclosed concrete fire staircase. The stairs at the Dolle Building are a single set that go from the parking lot to the basement level of the building.
Addendum 1 - Issued Thursday, December 12, 2024
Addendum 2 - Issued Monday, December 16, 2024
Closing Date: Wednesday, January 8, 2025
A meeting has been scheduled.
The project consists of hazard tree mitigation services by removal, pruning, thinning, deadwood pruning and snagging trees.
Closing Date: Wednesday, November 13, 2024
A site meeting has been scheduled.
This project is for the improvement of the gravel trail and driveway, including but not limited to clearing and grubbing, excavation and grading, erosion control, crushed surfacing placement and other work.
Addendum 1 - Issued Friday, October 25, 2024
Addendum 2 - Issued Wednesday, October 30, 2024
Addendum 3 - Issued Tuesday, November 5, 2024
Closing Date: Wednesday, November 13, 2024
In general, the project is to recover and overlay two (2) areas of existing roofing system, one (1) layer existing with new single-ply membrane roofing system with new flashing and other related work and in one separate are to remove two (2) layers of existing roofing and replace with new single-ply membrane roofing system with new flashing and other related work.
Closing Date: Wednesday, October 9, 2024
A site visit has been scheduled.
The project consists of the repair, crack cleaning and sealing and striping of two (2) parking lots located at Hockinson Meadows Community Park’s North lot and Pacific Community Park’s East parking lot.
Closing Date: Wednesday, August 7, 2024
A meeting has been scheduled.